JSW Energy bags turbine-generator order for 1,600 MW Salboni Phase-II
A order wins & contracts development with market-wide reach.
· Business Standard Mkts
JSW Energy's subsidiary JSW Thermal Energy has ordered two 800 MW turbine generators from Toshiba JSW Power Systems for Phase-II of the Salboni project.
The analysis
A large order lengthens revenue visibility, which is what the market pays a premium for in capital-goods and infra names.
Market context
- Sector exposure: Power.
- The immediate tone of coverage reads positive.
In this story
Power
Related coverage
L&T arm bags order worth over ₹5,000 crore for Jharkhand power project
India's wind power capacity may cross 250 Gw by 2035: Suzlon's Girish Tanti
ONGC, NTPC, BDL, BEL, IOC among 13 CPSE stocks to hit 52-week lows on Thurs
KP Energy locked at 5% upper circuit on 9-MW wind power project contract
NTPC arm to soon start commercial operations of 500 MWh BESS capacity: CEO